Beer or Beverage Cooling Tunnel Manufacturers/Spray Warm Bottles with Stainless Steel 6 Meter Long

Product Details
Type: Count Filling Machine
Automatic Grade: Automatic
Material Type: Liquid
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Main Products
Filling Machine, Shrink Sleeve Labeling Machine, Shrink Packaging Machine, Shrink Wrapping Packaging Machine, Water Treatment Plant, Water Production Line, Bottled Water Plant, Drinking Water Plant, Mineral Water Plant, Juice Making Machine
Registered Capital
500000 RMB
Find Similar Products

Basic Info.

Model NO.
WB-6
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Linear
Packaging
Bottle
Packaging Material
Plastic
Material
SUS304
Name
Beverage Cooling Tunnel Manufacturers
Capacity
4000bph
Item
Pasteurization and Cooling Tunnel
Delivery Time
45 Working Days
Type Kind
Food Industry Cooling Tunnel
Min Order
1 Set
Bottle
Plastic Bottle
Keyword
Spray Cooling Tunnel
Voltage
380V 50/60Hz
Function
Cooling Tunnel for Juice Bottle
Temperature Controller
Rkc Japan
The Total Power
6.6kw
Convey Chain
1.5m Width
Cooling Time
10-15mins
Transport Package
Plastic/Wooden
Specification
CE/ISO
Trademark
AK-MACHINE
Origin
Jiangsu
HS Code
8419899090
Production Capacity
3 Set/Month

Product Description

 Beer Or Beverage Cooling Tunnel Manufacturers/Spray Warm Bottles With Stainless Steel 6 Meter Long







 

The spray warm bottle & cooling pasteurizer is specialized used in cooling and sterilize the plastic bottles, glass bottles and can and other packages for drinking juice. The function of the machine is cooling the materials in the bottles to make the packing easily and sterilize the bottle and bottleneck at the same time, also can longer the warranty period of the juices.

Output: 250ml  10000BPH ( can be adjusted)

Bottle height: 92mm-310mm

Cooling:

The temperature of the chiller water

 3-5 ºC

Diameter of the cooling pipe

 25mm

Diameter of Tap water pipe

 25mm

Spray water temperature

3-5ºC

The total power

6.6KW

Total length

8 m

 

Warm bottle zones: 4 zones, 2m for each zone. The temperature of the 1st zone is constantly at

75-65 ºC, the 2nd zone temperture is constantly at 65-50 ºC. the 3rd zone temperature is constantly

at 30-20 ºC.

Cooling time: 10-15mins

Material: 304 stainless steel  korea thickness: 3mm

Water pump: Nanfang, Hangzhou

Electricmagnic valve, pneumatic component: Airtac Taiwan

Temperature controller: RKC Japan

Frequency converter: MITBUSHI Japan

Electric component: DELIXI

Convey chain: 1.5m width, high temperature resistance and high strength, plastic convey chain, made in china.

When you send inquiry,please also included the capacity and bottles shape and bottle volume you need to work on the machine, it is easy and accurately for us to recommand a right machine!

If any special,our manufacture also can design the machines according your requirement.

Mechanical Warranty
One year warranty and Lifetime technical support Install in Spot
If Engineers install in spot
1) Installment USD100/day. Person as allowance
2) Training fee is free for customer workers within the installation period
3) The tickets from China to the customer factory and return paid by the customer
4) The local housing , food, and transfer cost at customer factory paid by the customer


Delivery & Packing
Ø Delivery Time: 40 days after get your deposit.
Ø Coming Document:
1) Machine Quality Guarantee
2) Complete set install & maintain instruction Book in English language
3) Complete Document for customer to clear its custom
Ø Packaging requirement:;
1) The special packaging box is according to the immunity standard in China, it suits for long-distance
transport, damp proof, rustproof, land way and seaway

 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 20 - 30 days ,if complete line it is 45-60 days.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


 
 
Any more questions, please feel free to contact us!
 
 
 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier