5 Gallon Pure Water Filling Machine / 20 Liter Bottled Water Filling Machine / Mineral Plant Water Packing Production Line

Product Details
Customization: Available
Type: Count Filling Machine
Automatic Grade: Automatic
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (23)
Find Similar Products

Basic Info.

Model NO.
QGF-450
Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Linear
Packaging
Bottle
Packaging Material
Plastic
Name
5 Gallon Pure Water Filling Machine
Delievery
30 Days
Power
4.5kw
Process Kind
20L Water Bottling Plant
Usage
Fully Automatic Mineral Water Filler Capper
Wranty
2 Years
Capacity
450bph
Material
Stainless Steel
Control System
PLC
Item
5 Gallon Water Filling Machine
Transport Package
Plywood Case Packaging
Specification
CE/ISO
Trademark
AK-MACHINE
Origin
Jiangsu
HS Code
8422301090
Production Capacity
3 Set/Month

Product Description

 5 Gallon Pure Water Filling Machine / 20 Liter Bottled Water Filling Machine / Mineral Plant Water Packing Production Line




1).It is ideal equipment for producing mineral water, super-pure water,space water and distilled water.
 
2).Advanced PLC control system
 
3).The key parts are imported and their quality is reliable.
 
4).Barreled water production line machine is made of stainless steel.
 
5).Its structure is reasonable and its operation is convenient.
 
6).Easy cleaning and corrosion. 
Model QGF-1500 QGF-1200 QGF-900 QGF-750 QGF-600 QGF-450 QGF-300 QGF-150
Production capacity(b/h) 1500 1200 900 750 600 450 300 150
Total power (kw) 15 12 10 8 6 4.5 3.5 2.8
 Mechanical Warranty
One year warranty and Lifetime technical support Install in Spot
If Engineers install in spot
1) Installment USD100/day. Person as allowance
2) Training fee is free for customer workers within the installation period
3) The tickets from China to the customer factory and return paid by the customer
4) The local housing , food, and transfer cost at customer factory paid by the customer

Delivery & Packing
Ø Delivery Time: 40 days after get your deposit.
Ø Coming Document:
1) Machine Quality Guarantee
2) Complete set install & maintain instruction Book in English language
3) Complete Document for customer to clear its custom
Ø Packaging requirement:;
1) The special packaging box is according to the immunity standard in China, it suits for long-distance
transport, damp proof, rustproof, land way and seaway
 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 20 - 30 days ,if complete line it is 45-60 days.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


 

 Any more questions, please feel free to contact us!
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier